Assessing the Flood Risk to a Mine

Posted by Jamie Ross (Mining Man) on March 25, 2012
Posted in: Business Risk, Project Risk. Leave a Comment

Another summer of high rainfalls, full dams and flooding rivers around Australia has once again highlighted the catastrophic damage that can be caused to communities and businesses by floods and inundation.

Mining operations are certainly not immune to the risk of flooding from high rainfalls or inundation from surrounding water courses – in fact the nature of our sub-surface operations means we can be considerably more exposed to initial impacts, and subsequently impacted for a longer period.

Impacts of Flooding

The impacts of flooding rains come in a number of forms, and will affect different mines in different ways depending on their geographical location, type of operation, and access routes for logistics and transport to and from site. Impacts could include:

  1. Suspension of operations due to road conditions in the mine. Usually restricted to open pit mines, and often somewhat accounted for in budget operating assumptions.
  2. Water building up at working faces and mining areas from rain fall directly onto the mine site. The duration of interruption caused will depend on the on-site storage and pumping capabilities of the mine. Extended periods of rain increase the amount of water stored on site, hence reducing the available volume to remove any further build up of water from working areas.
  3. Inability to discharge water from storage areas into water courses. The requirements here vary by state, and are in many instances under review. Inability to discharge offsite in conjunction with full onsite storage areas means mining voids may have to be used as emergency storage areas.
  4. Road and rail systems off site being cut by flooding or damage, preventing personnel and supplies from getting to the mine, and preventing product from being shipped from the mine. For an underground mining operation, these impacts are likely to be the most important in terms of lost production and sales.
  5. Inundation of the site from surrounding water courses. Flooding of mining pits (underground or open cut) due to inundation from creeks or rivers has the potential to be the largest and most critical impact on an operation. Impact could be caused by inadequate protection from water courses, failure of protection levees, or extreme rain falls overtopping designed protection systems. The duration of the impact will depend on the mine’s capability to pump the water from the working areas to storage areas or back into water courses. Losses of equipment and infrastructure, and geotechnical instability may also occur.

 

Assessing the Risk

Mining operations should assess their risk and exposure to flood related interruptions and damage on a regular basis. Like any risk assessment, the site should consider the effectiveness and adequacy of their controls, both preventative and mitigating. The site should consider their exposure and likely impacts at the different levels of flooding, i.e. 1:10 year, 1:50 year, 1:100 year, 1:1000 year recurrence period flood events, and at the Probable Maximum Flood event level.

The risk assessment should consider impacts to onsite operations, as well as potential downstream and offsite interruptions. Different types of consequences should also be assessed – financial, production, health and safety, and environmental impacts.

Complications in Assessing Flood Risk

One complication that often arises in the assessment of flood risk is the dependence on the recurrence period estimates (i.e. 1:10, 1:100 years) of rain fall quantities and water course heights related to these events. If information based on these flood and rain fall levels is to be used when planning flood protection controls, it is critical that the site understands the basis for these numbers. For example, a 1:100 year rain fall event on a single day may not equate to a 1:100 flood event in the local area. Likewise, several days or weeks of 1:5 year rainfall over a large area could culminate in 1:500 year flooding levels further downstream.

There is an important differentiation to be made between a sudden intense dump and a long, slow build up of waters. Likewise the amount of rain in proceeding days and months makes a substantial difference to the impact from a particular amount of rain fall in a single event.

While recurrence intervals are useful when calculating the “likelihood” side of the risk equation, the risk assessment team should not place too much dependence on impact information associated with the particular intervals. The team should instead consider the different key levels of rain fall or flooding from minor up to the Probably Maximum Flood level, and then consider what controls are in place to manage the risk at each level. The controls should include predictive, monitoring, preventative, mitigating, and reinstatement controls.

Preparedness

In hindsight it is easy to assess what recurrence interval should be assigned to a particular event which has already occurred. Calculations can provide a 1 in X years estimate for a flood or rainfall event in the past, but no one can yet predict what numeric level an approaching weather system will reach. If only they could tell us that the low approaching next week was going to be a 1 in 125 year event, we could probably prepare a lot better!

Mine sites should have a written system (Trigger-Action-Response Plans) for what will be done in preparation for and during rain fall events, and what exactly will trigger them to take those particular actions. These response plans must relate specific triggers to specific actions, and allocate those actions to specific people. The triggers may come from weather forecasts or actual measurements during an event.

Response and Reinstatement

Mining operations should have sound and thorough reinstatement plans in place to return assets and operations to service as soon as possible, with minimum risk to safety. The plans may be known as Asset Reinstatement Plans, Business Interruption Plans, Contingency Plans, or Continuity Plans. These plans should be based on risk assessment, and draw on recent industry experience in developing the roles and activities to be undertaken following a major flood or rainfall event.

Mining Risk Management Services – Specialists in Critcal Business and Safety Risks.  Click here to see our capability and services.

All photos courtesy of www.MiningMayhem.com

The Future of Risk – Are we on the Wrong Track?

Posted by Jamie Ross (Mining Man) on November 14, 2011
Posted in: Risk News. Tagged: articles. Leave a Comment

For many thousands of years before we’d ever put capital letters on the term Risk Management, people were already managing their risks – albeit a different set of risks from those we face today.  On the day man lit his first fire he quickly worked out what the new hazard was that he had created, and how best to prevent himself and others from getting hurt as a result.

Risk management in its most basic form means being able to understand what things might happen to you that you don’t want to happen, and how you are going to try and prevent them or at least reduce the chance of them occurring.

People did this long before Risk and Risk Management as fields of study were even invented – they just didn’t have formal processes and templates for doing it.

Continue Reading

Four Tips for Attending a Risk Assessment

Posted by Jamie Ross (Mining Man) on November 9, 2011
Posted in: Project Risk. Tagged: planning, risk assessment. Leave a Comment

So you’ve been invited to a Risk Assessment?  Not sure why you’ve been invited or what is going to happen there?  Not sure how you can best contribute?  Here’s Mining Man’s four tips on what to expect in a team risk assessment session, including the terminology you might hear, how the process might work, and how you can best contribute.

If you’ve been asked (or told) to attend a “Risk Assessment” but have never participated in one before, it’s likely that you’re a little unsure about exactly what is involved and why you’re being asked to contribute. Continue Reading

Ten Tips for a Successful Project Risk Assessment

Posted by Jamie Ross (Mining Man) on October 22, 2011
Posted in: Project Risk. 2 comments

Whether your project is a new piece of equipment, a new construction, or a new mine, risk assessments are often seen as a necessary evil when it comes to managing and delivering a project.  But it shouldn’t be that way.  A well run, targeted, efficient risk assessment workshop can provide enormous value to all the participants, the project managers, and most importantly the clients or investors.

As the project manager, your aim is to get the most information, understanding and management of risk possible in the most efficient way – and that means minimising the time and resources required, while maximising the value of the process and the outputs.  To do this requires a specific, practical and experienced approach.
Here’s our top ten tips to make the risk assessments processes for your project  the most efficient and value-adding they can be: Continue Reading

New Risk Management Standard for Australia

Posted by Jamie Ross (Mining Man) on October 22, 2011
Posted in: Risk News. Leave a Comment

Australia helped pioneer the concept of a Risk Management Standard, with the development of the original Australia Standard for Risk Management – AS4360. The effectiveness and success of this standard led to it becoming the foundation for a new International Standard for Risk Management, developed by the International Organisation for Standardisation (ISO).

In November 2009, the ISO released the latest version of their Risk Management Standard, ISO 31000. The standards committee for Australia and New Zealand determined that instead of maintaining a separate Australia Standard for risk management, they should instead adopt the international standard.

Hence, from this year, AS4360 is now no longer the relevant standard for Risk Management in Australia, we now work under ISO 31000. Continue Reading

Welcome to Mining Risk Management

Posted by Jamie Ross (Mining Man) on October 22, 2011
Posted in: About MRM. Leave a Comment

At Mining Risk Management we take a unique approach to risk assessments and risk management plans.  From a new equipment purchase to a full mining project study, we focus on identifying the highest risks to your operation and then developing practical ways to manage and reduce them.

While our methods focus on delivering workable outcomes and creating an involving workshop experience, our outputs and reports are tailored to your project management, team management and upward reporting requirements.

We leave your project team with a better understanding of their project risks, an action plan to address them, and an ongoing monitoring tool to ensure that your most critical controls keep working as they should throughout the life of the project.

In our extended workshops we dive deeper into these “critical controls” and challenge the team as to how adequate and effective these most important controls are in ensuring project success.

Why Choose Us?

  • Mining industry specialists, with years of experience in all phases of projects and operations
  • Deep understanding of mining value drivers, hazards and best-practice control methods
  • Outcome focussed, not addicted to tedious process
  • Tailored workshop sessions, reports and deliverables
  • Intelligent use of pre-work to improve workshop flow and efficiency
  • Applicable to projects large and small – from a greenfields mining project to the purchase of a new machine
  • All risk assessment processes are compliant with ISO31000 (and AS4360)

Posts navigation

  • Recent Posts

    • Assessing the Flood Risk to a Mine
    • The Future of Risk – Are we on the Wrong Track?
    • Four Tips for Attending a Risk Assessment
    • Ten Tips for a Successful Project Risk Assessment
    • New Risk Management Standard for Australia
  • Enter your email address to follow this blog and receive our latest articles by email.

  • Navigate

    • Home
    • About Us
    • Services
    • Who We Work With
    • How We Work
    • Contact Us
    • Blog
  • Search This Site

  • Blog Categories

    About MRM Business Risk Project Risk Risk News
  • Safety and Leadership Tips

    Head over to MiningMan.com for free tips, tools and advice on all things risk, safety, leadership and productivity.

Blog at WordPress.com. Theme: Parament by Automattic.